About this Event
Speaker Bio: Louis Boissonneault, ing., PMP, is Director, Project Management, Québec, at WSP, where he has worked since 2007. With some 30 years of experience in the private and public sectors, he specializes in delivering projects in occupied buildings with minimal impact on operations. He leads WSP’s Québec project management team and is involved in two of WSP’s MSA mandates associated to the Montréal Olympic Stadium’s new roof and technical ring and the modernisation of the stands (Gradins). In this session, he will share WSP’s role on this iconic project, from the initial assessments through design and execution.
Presentation Abstract
Built in 1971, the Montréal Olympic Stadium is a one-of-a-kind building, one of Montréal’s most emblematic landmarks and a key feature of the Olympic Park. As Owner’s Engineer, and sub-consultant to Populous/A49, WSP has supported the Olympic Stadium on two major mandates: the roof replacement and the modernisation of the stands (Gradins). This presentation provides an overview of the renovation work and showcases WSP’s involvement from the earliest assessments through design and execution.
Highlights:
· Development phase: a challenging project, from a technical point of view
· Design and execution phase: new technical ring equipment, electrical distribution, lighting, fibre optics and sound systems
· Stands modernisation: how it ties in with the roof replacement
· Timeline: work completed to date and planned through 2029
---------------------------------------------------------------------------------------------------
Event to be held at WSP, 1600 René-Lévesque Blvd. W., 15th floor, Training Room
Enter through the main entrance and take the elevators to the 15th floor.
Food and refreshments from 5:20 pm. Meeting time: 6:00 pm to 7:30 pm.
Event venue & nearby stays
1600 Boul. René-Lévesque O 15 floor, 1600 Boulevard René-Lévesque Ouest, Montréal, Canada