About this Event
Meet the Primes Session – RFP #07 – Buffalo Bills Stadium Demolition
The project includes decommissioning of the existing Buffalo Bills Stadium, demolition & abatement, disconnect and removal of existing utilities applicable such that site can be filled to grade and left for future uses.
Attend this session on Thursday, November 13, to network with invited Prime/Tier-1 firms actively seeking partnerships on the demolition scope of services for the existing Highmark Stadium. Minority-, women-, service-disabled veteran-owned firms are encouraged to attend, network, and engage with Prime/Tier-1 firms pursuing this project. A site walk through will follow the conclusion of the event.
60 – Demolition & Abatement (SC-201): abatement of all asbestos containing materials; demolition of existing stadium structure; haul and disposal of debris not scheduled to remain on site
62 – Concrete Retaining Wall (SC-301): new retaining wall to close off existing tunnel to administration building that is to remain.
63 – Waterproofing of Retaining Wall (SC-701): waterproofing of above new wall
64 – Plumbing & HVAC—Cut/Cap, Make Ready (SC-2201): cut and cap existing utilities to make safe; disconnect existing plumbing/mechanical equipment; reclaim refrigerants, drain glycol; temporary water system
65 – Electrical—Cut/Cap, Make Ready (SC-2601): cut and cap existing electrical services and systems to make safe; temporary power
66 – Sitework and Site Utilities (SC-3101): extend new site utilities; site grading and paving outside existing stadium footprint
67 – Spoil Pile Load, Haul, Fill existing stadium (SC-3102): load, haul, fill from existing spoils; pull out fill to existing stadium footprint, including compaction
The event is located in the Pepsi West Club of the existing Highmark Stadium with entrance accesible through Gate 6. Parking is available in Lot 6 of the existing Highmark Stadium
Event Venue & Nearby Stays
Highmark Stadium - Pepsi West Club, 1 Bills Drive, Orchard Park, United States
USD 0.00