About this Event
Course covers how to properly administer the installation practices for the Daikin VRV IV-X and Emerion indoor and outdoor equipment and accessories to include refrigerant piping, condensate piping and electrical wiring in accordance with current published literature guidelines using the proper tools and equipment. Course covers how to properly configure and commission the Daikin line of remote controllers, determine proper applications of the Daikin DIII-Net System Control as well as how to properly access, configure and commission the outdoor unit field settings Modes 1 and 2. Pre-commissioning and System Commissioning Steps will be covered as well as the proper usage of the software for proper commissioning of the Daikin VRV IV X System.
Event Venue & Nearby Stays
Johnstone Supply, 238 Riverside Street, Portland, United States
USD 0.00